1 00:00:05,349 --> 00:00:03,350 systems nominal zero point in the zvezda 2 00:00:08,070 --> 00:00:05,359 service module parmitano joined by 3 00:00:11,030 --> 00:00:08,080 russian cosmonaut alexander misurkin uh 4 00:00:13,350 --> 00:00:11,040 at a control panel uh at the ready uh to 5 00:00:15,669 --> 00:00:13,360 initiate an abort uh command should that 6 00:00:17,590 --> 00:00:15,679 be required however all of albert 7 00:00:20,470 --> 00:00:17,600 einstein's systems are rock solid at 8 00:00:23,269 --> 00:00:20,480 this point in good shape as we uh near 9 00:00:25,830 --> 00:00:23,279 the station keeping point called s4 10 00:00:28,070 --> 00:00:25,840 and a distance of just 62 feet 11 00:00:33,830 --> 00:00:28,080 between the automated transfer vehicle 12 00:00:38,790 --> 00:00:37,510 now receiving this video from the camera 13 00:00:40,869 --> 00:00:38,800 on the 14 00:00:42,389 --> 00:00:40,879 zvezda service module over russian 15 00:00:47,350 --> 00:00:42,399 ground stations 16 00:00:50,310 --> 00:00:48,389 target 17 00:00:53,750 --> 00:00:50,320 the docking probe at the forward end of 18 00:00:56,069 --> 00:00:53,760 the automated transfer vehicle 19 00:00:58,709 --> 00:00:56,079 you see in the lower left-hand corner 20 00:00:59,750 --> 00:00:58,719 the data on this engineering overlay 21 00:01:02,630 --> 00:00:59,760 screen 22 00:01:05,109 --> 00:01:02,640 showing a distance of 18.9 meters 23 00:01:07,030 --> 00:01:05,119 separating the two vehicles that's 62 24 00:01:09,190 --> 00:01:07,040 feet in uh 25 00:01:11,270 --> 00:01:09,200 non-metric terms 26 00:01:13,910 --> 00:01:11,280 and a closing rate of zero at the moment 27 00:01:14,789 --> 00:01:13,920 so our rates are nulled uh however that 28 00:01:17,350 --> 00:01:14,799 uh 29 00:01:19,910 --> 00:01:17,360 that will soon change as the commands 30 00:01:22,149 --> 00:01:19,920 are issued to reinitiate uh the approach 31 00:01:24,630 --> 00:01:22,159 of the albert einstein for its docking 32 00:01:29,030 --> 00:01:24,640 that is scheduled at around 907 a.m 33 00:01:32,630 --> 00:01:29,040 central time 1007 a.m eastern time 34 00:01:40,469 --> 00:01:32,640 target in the center systems nominal 35 00:01:45,590 --> 00:01:43,670 four meters target in the center 36 00:01:47,749 --> 00:01:45,600 point zero seven 37 00:01:53,190 --> 00:01:47,759 systems nominal copy 38 00:01:59,190 --> 00:01:56,630 approaching the ground hands off point 39 00:02:01,190 --> 00:01:59,200 three meters by the ruler target in the 40 00:02:04,230 --> 00:02:01,200 center point zero six and closing 41 00:02:07,030 --> 00:02:04,240 systems nominal copy 42 00:02:11,430 --> 00:02:09,589 two ground is hands off now 43 00:02:13,430 --> 00:02:11,440 meters 44 00:02:14,710 --> 00:02:13,440 start breaking copy 45 00:02:17,750 --> 00:02:14,720 two meters 46 00:02:32,869 --> 00:02:20,630 systems nominal target in the center 47 00:03:03,110 --> 00:02:35,190 one meter away 48 00:03:06,869 --> 00:03:05,589 drift docking occurring at 907 am 49 00:03:08,550 --> 00:03:06,879 central time 50 00:03:11,430 --> 00:03:08,560 as the international space station and